03 / Process
Four steps, and no calendar.
How an enquiry becomes a drawing. A count of days does not belong here until a particular reply has agreed it.
The drawing office
From enquiry to issue
Enquiry, scope, draft and issue. This page states no durations. A date is confirmed in the reply, not in the website text.
- 01
Enquiry
The object, the limits, and the files you already have. A date you hope for is a request.
- 02
Scope
The reply names what will be drawn, in which files, and what is not in the job.
- 03
Draft
A set to comment on. A comment changes the revision. It does not silently edit the same sheet.
- 04
Issue
The agreed formats. A PDF to read, and DXF and STEP where they were in the scope.
The hall's production lineTo 20 mm on a 2 x 4 m bed
CNC laser cutting
The beam walks the plate; a glowing cut edge follows it.
- Published process
- To 20 mm on a 2 x 4 m bed
Drag sideways to turn the model
Ferrota draws. Welded structures are built by the sister brand Tanax Structures in the TANAX TRUCKS hall in Bánovce nad Bebravou. These are its published machines and processes, as schematics built in code.
- 2 x 4 m bedTo 20 mm on a 2 x 4 m bed
- PlateTo 20 mm on a 2 x 4 m bed
- GantryTo 20 mm on a 2 x 4 m bed
- Cutting headTo 20 mm on a 2 x 4 m bed
02 / 08400 t, 6 050 mm table
Press brake
The ram comes down and folds the sheet along the full table.
- Published process
- 400 t, 6 050 mm table
Drag sideways to turn the model
- Press frame400 t, 6 050 mm table
- 6 050 mm table400 t, 6 050 mm table
- Ram and tool400 t, 6 050 mm table
- Sheet being bent400 t, 6 050 mm table
03 / 08Manual and robotic, under EN ISO 3834-2
MAG welding
The seam runs along the frame; joints glow and cool.
- Published process
- Manual and robotic, under EN ISO 3834-2
Drag sideways to turn the model
- Welding tableManual and robotic, under EN ISO 3834-2
- Frame being weldedManual and robotic, under EN ISO 3834-2
- TorchManual and robotic, under EN ISO 3834-2
04 / 0814 m
Robotic welding track
The carriage with the robot travels along fixtures holding a series of parts.
- Published process
- 14 m
Drag sideways to turn the model
- 14 m track14 m
- Carriage14 m
- Robot arm14 m
- Fixtures with parts14 m
05 / 08Travel to 8 000 mm
Horizontal boring
After welding: the table with the part traverses the spindle so faces come out flat and bores true.
- Published process
- Travel to 8 000 mm
Drag sideways to turn the model
- Bed with 8 000 mm of travelTravel to 8 000 mm
- ColumnTravel to 8 000 mm
- Spindle headTravel to 8 000 mm
- Table with the partTravel to 8 000 mm
06 / 08To Sa 2½ in an 8 x 5 x 3 m chamber
Blasting
Grit in a haze; the surface turns from mill scale to bright steel.
- Published process
- To Sa 2½ in an 8 x 5 x 3 m chamber
Drag sideways to turn the model
- 8 x 5 x 3 m chamberTo Sa 2½ in an 8 x 5 x 3 m chamber
- Part on the railTo Sa 2½ in an 8 x 5 x 3 m chamber
- Rail to the boothTo Sa 2½ in an 8 x 5 x 3 m chamber
07 / 08Spray and curing booth connected by rail
Wet painting
The part rolls on the rail from the chamber into the booth and takes its colour.
- Published process
- Spray and curing booth connected by rail
Drag sideways to turn the model
- Spray and curing boothSpray and curing booth connected by rail
- PartSpray and curing booth connected by rail
- RailSpray and curing booth connected by rail
08 / 08Six-axis measuring arm
FARO arm measurement
The probe walks the frame and leaves measurement points to compare with the drawing.
- Published process
- Six-axis measuring arm
Drag sideways to turn the model
- Measured frameSix-axis measuring arm
- Arm baseSix-axis measuring arm
- Touch probeSix-axis measuring arm
The hall's production line
Where the drawing goes next.
The issued set can go to the group's own hall, shown above, or to any workshop you choose. Either way it is drawn to be read without the person who drew it.
Step by step
What each step needs, and what comes back.
The same four steps for every kind of work. What you send decides how many questions come back.
- 01
Enquiry
- You send
- The object, its limits, the files you already have and the date you hope for.
- The office delivers
- A reply by email, written by a person, to the address you typed.
- 02
Scope
- You send
- Answers, if the reply asks about something the files do not show.
- The office delivers
- What will be drawn, in which files, what is not in the job, and the date.
- 03
Draft
- You send
- Comments on the set, sheet by sheet.
- The office delivers
- A new revision for each round of comments, never a silent edit of the same sheet.
- 04
Issue
- You send
- Your confirmation that the last revision is the one to build from.
- The office delivers
- The agreed formats: the PDF to read, and DXF, STEP or DWG where they were in the scope.
Good to know
Dates, revisions and formats.
- 01
Dates
A duration depends on the object, the files that already exist and the rounds of comments. The date is agreed in the reply, never promised in advance on this page.
- 02
Revisions
Every round of comments gives a new revision. The title block says which one is current, so nobody builds from an old sheet.
- 03
Formats
PDF, DXF, STEP and DWG. Which of them a job delivers is written into the scope, not added by assumption.
Journal
Read before step one.
The whole journalHow to prepare an RFQ for steel fabrication drawings
What to put in a request when you need a construction design or production drawings: the object, the constraints, the files you already have, and the formats you need back.
Tolerances and title blocks on a workshop drawing
A drawing with no tolerance note leaves the shop to guess. What belongs in the title block, how a revision is written, and why a sheet needs one origin.