Construction design and production drawingsBánovce nad Bebravou
FerrotaThe drawing, before the steel is cut.
From a first sketch to the files a workshop cuts from: construction design, production documentation and drawing review.
Scroll the page
What we draw
The work is the drawing.
All servicesContainer modifications, steel structures, and the sheets and files a workshop cuts from. A page here is not a catalogue of finished jobs.
- 01
Container modifications
Openings and the frames a container conversion needs.
- 02
Steel structures
Welded frames, from a single bay to a larger arrangement.
- 03
Frames and platforms
Access platforms, supports, and the members that hold them.
- 04
Conveyors and hoppers
Hoppers, chutes, and the frames that carry a conveyor.
- 05
Workshop drawings
Sheets a workshop can read: views, dimensions, and a title block.
- 06
Assembly and parts
The arrangement, and a sheet for each part that needs one.
- 07
Bills of materials
Marks and quantities, under the same names the files use.
- 08
Cut files
Closed profiles for CNC and laser cutting, where the job includes them.
How we work
From the brief to the files.
How a job runsFour moves. A date is confirmed in the reply, not on this page.
- 01
Brief
The object, its limits, and the files you already have.
- 02
Model
A 3D model of the arrangement, so the sheets follow one solid.
- 03
Drawings
Assembly and part sheets, with dimensions, a title block, and a revision.
- 04
Production files
PDF to read. DXF, STEP, or DWG where the reply put them in the scope.
Software and files
Industry-standard 3D CAD.
File formats in fullModels are prepared in industry-standard 3D CAD. This site does not name a program, and it does not publish a model file. Files are exchanged only inside an agreed job.
- The sheet to read: dimensions, units, a general tolerance, and the title block.
- DXF
- 1:1 in millimetres for the parts that are cut. Closed profiles, no dimension text.
- STEP
- The solid, when the fabricator or the next designer needs the volume.
- DWG
- The editable source, when the drawing is handed on for further work.
- BOM
- A list of marks and quantities, using the same names as the sheets.
An enquiry can attach STEP, IGES, DXF, DWG, PDF, or ZIP.
Why Ferrota
Drawings a workshop can build from.
Four rules the office keeps on every set, from a single part to a whole arrangement.
- 01
Drawn inside a fabrication group
Ferrota is operated by Tanax Trucks a.s., whose hall in Bánovce nad Bebravou cuts, bends, welds, blasts, paints and measures steel. The office draws with the shop floor in mind.
- 02
Dimensions from one origin
Openings and parts are dimensioned from one agreed origin, not each from a different corner, so nobody on the shop floor adds up a chain of numbers.
- 03
Questions before assumptions
Where a brief leaves a gap, the office asks rather than guesses. A format or a detail that nobody named is not added in silence; it comes back to you as a question.
- 04
Always one current sheet
The revision sits in the title block of every sheet, and its sequence is agreed with the people who build from the drawing, so the workshop always knows which sheet is current.